Duratec was engaged to complete repairs to concrete and steel bearing plates and steel reinforcement at Wells Road Bridge over the Patterson River at Patterson Lakes.

Details

The scope included:

  • Erection of scaffolding with full encapsulation to bridge bearings.
  • Concrete breakout to all 200 identified areas.
  • Abrasive blast steel bearing plates and steel reinforcement within concrete repair areas.
  • Application of primer coat to steel bearing plates and steel reinforcement within patch repairs.
  • Application of top coats to steel bearing pads.
  • Completion of concrete patch repairs.
  • Crack injection to nominated areas.
  • Backfilling to northern abutment wall.

Highlights

  • Works were undertaken on a bridge that spanned an environmentally sensitive waterway.
  • Strict compliance to environmental requirements of Parks Victoria and Melbourne Water.+
  • Works successfully completed in a tight time frame.

Capabilities

  • Concrete Repair
  • Abrasive Blasting & Painting
  • Bridge Maintenance

 

Interested in working with us? Get in contact