HMAS Stirling, also known as Fleet Base West is the Royal Australian Navy’s (RAN) base located on Garden Island, approximately 35km south of Perth.

Details

Stage 3A BU3 Building Maintenance:
The refurbishment of 26 buildings to provide an enhanced workplace environment. Mainly architectural with minor structural works, but also includes air conditioning, electrical and fire safety.

Stage 3A BU3 Building Maintenance:
The refurbishment of 26 buildings to provide an enhanced workplace environment. Mainly architectural with minor structural works, but also includes air conditioning, electrical and fire safety.

  • Architectural (internal and external).
  • Structural.
  • Mechanical.
  • Electrical.
  • Fire.

RO1 Roof Repairs and Maintenance:
Duratec has been engaged to complete roof repairs and maintenance to 52 buildings:

Roof tiles and roof plumbing for 21 buildings:

  • Re-roof or partial re-roof to both tile and tin roof buildings.
  • Roof plumbing (flashings, gutters, downpipes).
  • Minor mechanical works (HVAC) associated with replacing roof.

Working at heights access systems for 31 buildings:

  • Design, coordinate, fabricate and installation of new height safety systems.
  • Identify, inspect, recertify and record all height safety access systems for ongoing maintenance and management.

Capabilities

  • Electrical Upgrades
  • Fireproofing
  • HVAC Upgrades

Interested in working with us? Get in contact