Duratec was engaged by Augility to be the managing contractor for the floor remediation of hangar 186 at RAAF Base Wagga. The team specified a specialised three-part epoxy floor coating.

Prior to the application of the coating, Duratec prepared the work area by grinding the floor to remove all existing line marking, and demolishing and replacing old concrete to remediate uneven and dilapidated areas. The floor was then expertly cleaned ready for the epoxy application.

Towards the end of the project, Duratec was able to reinstall the line marking and reseal all concrete joints. The completed works provided a bright and refreshed-looking hangar, that was safe for
use by all base personnel.

Highlights

  • There was restricted access to the base
  • Timeline restrictions were in place due to nature of the site
  • The team rectified non-compliance and safety issues