The work site was at RAAF Edinburgh Airside which is 45km north of Adelaide in the Edinburgh Defence Precinct.

Details

The scope of works included the following:

  • Crushing of C&D waste to 20mm aggregate: 60 tonne bitumen and 20 tonne concrete lot.
  • Placement and compaction of crushed C&D waste as road base at designated locations.
  • WSO services IAW MOS139 and RAAF Edinburgh Aerodrome management.

Highlights

  • FOD hazard as airside
  • Removal of possibly contamination
  • Performed works to meet strict Department of Defence standards.