DownerMouchel engaged Duratec to perform repair works to Pittwater Road Bridge over Mullet Creek, 100km north-west of Sydney.

Details

The scope of works included:

  • Preparation of the steel by ultra high pressure water blasting.
  • Application of a two component modified epoxy barrier coat.
  • Application of a two component acrylic polyurethane finish.

Highlights

  • Concrete repairs to piers, headstocks, columns, prestressed beams and bridge parapets.
  • Installation of cathodic protection.
  • Installation of grout into voids beneath existing batter protection.
  • Reconstruction of a section of the abutment footing and batter protection.
  • Removal of graffiti from the visible surfaces of the bridge.
  • Application of protective coatings to concrete surfaces.