Completed in 2015, Port Melville is primarily used for cargo operations, fuel distribution and as a logistical hub for the oil and gas industry.

Details

Duratec has been engaged by NT Port and Marine to complete concrete repairs to the wharf.

The scope of work will include:

  • Jackhammer out spalling concrete to expose corroded reinforcement bars.
  • Hand preparation of corroded reinforcement bar.
  • Application of a zinc rich coating to reinforcement bar.
  • Pouring of reinstatement mortar to complete repairs.
  • Application of a curing membrane.

Highlights

  • The works will be completed with minimum disruption to port operations.

Capabilities

  • Concrete Repair

Interested in working with us? Get in contact