Refurbish a footbridge that spans Leach Highway in the Perth suburb of Rossmoyne.
Details
The scope of works includes general concrete repairs, crack injection, joint sealing, and the removal of anti-graffitti coatings.
After the repairs the bridge soffit received a complete coat of a crack-accommodating elastomeric acrylic.
Highlights
- Most of the works was completed on night shift to avoid disruption to motorists using Leach Highway.
- The project required full traffic management and significant signage for public awareness and protection.
- Water blasting to prepare the concrete for coating was utilised to minimise dust.
- Crack injection was carried out using a hydrophilic flexible polyurethane grout.
Capabilities
- Concrete Repair
- Bridge Maintenance