Refurbish a footbridge that spans Leach Highway in the Perth suburb of Rossmoyne.

Details

The scope of works includes general concrete repairs, crack injection, joint sealing, and the removal of anti-graffitti coatings.

After the repairs the bridge soffit received a complete coat of a crack-accommodating elastomeric acrylic.

Highlights

  • Most of the works was completed on night shift to avoid disruption to motorists using Leach Highway.
  • The project required full traffic management and significant signage for public awareness and protection.
  • Water blasting to prepare the concrete for coating was utilised to minimise dust.
  • Crack injection was carried out using a hydrophilic flexible polyurethane grout.

Capabilities

  • Concrete Repair
  • Bridge Maintenance

Interested in working with us? Get in contact