Duratec were engaged by Barrick to carry out significant concrete repairs to their stock pile plinths.

Details

This project involved the hand breakout, delineation and form and pour of a high strength concrete repair mortar.

Once the repairs had cured the plinths were treated with the application of a surface penetrating silane cream designed to impede the ingress of water and chlorides. The stock pile columns will then be abrasive blasted and coated with a two pack epoxy system in order to protect against future corrosion.

Highlights

  • Precast “T” Blocks were installed behind each of the stock pile plinths in order to create a safe working environment for the Duratec specialist crew.
  • Reinforcement bars were grit blasted and primed followed by the installation of a new slim line sacrificial anode, designed to reduce unnecessary breakout and inevitably extend the life of the structures steel.