Duratec Australia was engaged to produce a technical
specification to undertake repairs to the concrete struts of the Fremantle Traffic Bridge.
Details
The scope of works comprised of the following:
Repair methodology for:
- Blast and paint of the exposed steel splice strengthening.
- Concrete strut corner repairs.
Budget estimate for:
- Blast and paint of the exposed steel splice strengthening.
- Blast and paint of the steel tie anchor beams.
- Concrete strut corner repairs.
- Re-wrapping the high tensile tension ties.
- The specification was presented in a concise report inclusive of detailed repairs scopes and diagrams.
Highlights
- The client received a formal report which clearly explained the repairs specifications at a high level of detail.