Duratec Australia was engaged to produce a technical
specification to undertake repairs to the concrete struts of the Fremantle Traffic Bridge.

Details

The scope of works comprised of the following:

Repair methodology for:

  • Blast and paint of the exposed steel splice strengthening.
  • Concrete strut corner repairs.

Budget estimate for:

  • Blast and paint of the exposed steel splice strengthening.
  • Blast and paint of the steel tie anchor beams.
  • Concrete strut corner repairs.
  • Re-wrapping the high tensile tension ties.
  • The specification was presented in a concise report inclusive of detailed repairs scopes and diagrams.

Highlights

  • The client received a formal report which clearly explained the repairs specifications at a high level of detail.