Duratec was engaged by Augility to be the managing contractor for the refurbishment of the Duntroon Base Gymnasium and Rehabilitation Centre.
Duratec’s strategy was a complete overhaul of the existing gymnasium & facilities and installation of an updated stormwater drainage system and fire services field equipment. The finished result not only provided the client with a refreshed, modern and light-filled space, but with added functionality.
Highlights
- Height work and Boom lift operation.
- Repaint of internal and external structures.