Duratec was engaged by Augility to be the managing contractor for the refurbishment of the Duntroon Base Gymnasium and Rehabilitation Centre.

Duratec’s strategy was a complete overhaul of the existing gymnasium & facilities and installation of an updated stormwater drainage system and fire services field equipment. The finished result not only provided the client with a refreshed, modern and light-filled space, but with added functionality.

Highlights

  • Height work and Boom lift operation.
  • Repaint of internal and external structures.

Interested in working with us? Get in contact