Correct a ponding issue on the footbridge between building 408 and 400 at the University’s Bentley Campus.
Details
An epoxy screed was installed to correct the ponding issues before a self-leveling epoxy with non-skid topcoat was applied.
Additional concrete and masonry repairs were also completed to the underside of the bridge and building entrances with the aesthetics taken care of by a full repaint of structural steel handrails and internal gyprock walls.
Highlights
- A Duratec qualified surveyor took levels across the bridge to establish existing falls.
- Works were carried out during the hot summer period at a time when least disruption would occur to staff and students.
- Tremco’s Vulkem UV resistant trafficable deck coating system was used.