Augility has engaged Duratec to perform electrical upgrades at Campbell and Irwin Barracks. The scope includes:
Details
Irwin Barracks Oval Lighting
- Supply and installation of 4 x new 20m high oval light poles, sports lighting and obstacle lights.
- Design and installation of new light pole foundations.
- Excavation and installation 350m of new electrical conduits and cabling.
- Testing and commissioning of new installation.
- Remediation of oval on completion of works.
Irwin & Campbell Barracks Street Light Upgrades
- Removal and disposal of 138 existing street light luminaires.
- Supply and install 138 new LED street light luminaires.
- Replacement of damaged light pole connection boxes and connection box lids.
- Earthing checks and remediation during new installations.
- Testing and commissioning.
Highlights
- Building good relationships with client and supplier organisations.
- Flow on of works from existing projects on the base.
Capabilities