BHP utilised Duratec’s expertise to remove the existing signage and design, fabricate and install a new LED double-sided sky sign.

Details

The scope included:

  • Three levels of dropped object protection designed and installed.
  • Design, fabrication and installation of structural steel and perforated panels to fit the existing structure.
  • Original steel structure prepared and painted to specification.
  • Implementation of a fault detection system to protect the integrity of the brand.

The result was an improvement of visual aesthetics in line with client’s corporate branding.

Highlights

  • 10,950 total labour hours.
  • LTI and major incident free.

Capabilities

  • Facade Refurbishments
  • Signage Installation & Maintenance

Interested in working with us? Get in contact