Duratec has been engaged to decommission the existing pool gas heat system and install air source heat pumps and services.

Details

The main purpose of the works was to decrease energy consumption and increase defence base ratings.

Highlights

  • Duratec had to undertake verification of design and provide a different solution to meet pumps power supply requirements.
  • The replacement and installation of existing and new assets was carried out in conjunction with the Defence Estate Data Tool.

Capabilities

  • Electrical Upgrades

Interested in working with us? Get in contact